1.High construction efficiency and short construction period.
The time to remove Aluminum Formwork can be in 18-36 hours. Normal construction can reach 4-5 days and one layer, thus greatly shortening the construction period, saving management costs for contractors, and shortening the development cycle for real estate developers.
2.Solution maked while Design
Before construction, detailed and accurate analysis of the project and design of the construction plan should be done, and the problems that may be encountered in construction can be solved in the design stage to the greatest extent, in conjunction with the product series of modularization, systematization and standardization of the aluminium formwork system.
3.High Quality
Aluminum formwork system is made by high strength aluminum alloy profiles 6061-T6 . The manufacturing process of the products is STRICTLY in accordance with the relevant product quality control standards of the United States. The stitching and overall accuracy of the formwork are much higher than that of the traditional one.
4.Good Surface
The surface of concrete is good after removing the formwork: after removing the formwork from the aluminium formwork, the surface quality of concrete is smooth, which can meet the requirements of decoration and fair-faced concrete, without plastering, and can save the cost of secondary plastering.
5.Test installation
100% of the whole test installation is done in factory All possible problems are solved in the factory, thus greatly improving the construction speed and accuracy.
6.Construction Safety
The design of wall panel, sash floor, adjustable support and even related parts of the aluminum formwork system has been fully calculated and verified by experiments to ensure that the whole system conforms to the 60KN/M2 design standard. According to the relevant standards of the United States, a safety factor of 2:1 is retained, which removes the potential safety hazards caused by the uncertainty of equipment and construction brought about by the traditional support mode.
7.Cost Savimg
Aluminum formwork is reusable and lower cost sharing. In developed countries and regions, it has a history of more than ten years, and its use is becoming more and more popular. Reused 300 time for multipe project , Much more times than the timer formwork and Plywood ,80% of the AL formwork panel can be reused . The aluminium materials Recyle value is up to 30% of the purchase cost .
8.Easy to use
It is convenient and fast, only simple training is needed for the construction installation. No matter how to use the aluminum formwork system, the basic methods and components are the same, and the construction workers can skillfully use it; the formwork has high precision, which can save the secondary plastering materials and labor costs on the wall, and also ensure the quality of the building to a higher safety factor.
We located in Shandong Linqu County Longshan high-tech Industrial Park, it covers an area of more than 200 Mu and an area of more than 170,000 square meters CAPACITY: 200,000 SQM per year. It has 5 domestic advanced Aluminum Alloy formwork production lines, 8 automatic adjustable electronic feed SAWS, 8 NC CUT-OFF SAWS, 4 NC cut-off Saws at any angle, and 10 Kuka double position welding robots. Has a strict production management system, scientific process, advanced processing technology, with product research and development, design, quality inspection center. By strict product quality control, the implementation of 6s management methods, dedication to users of first-class products and quality service.